Saturday, November 7, 2026 · ETIndependent, factual news
The Franklin DeskThe buck stops here.

Technology / Other

ESA reports Prometheus engine tests at upgraded German facility

The Oct. 29 firings tested methane capability and a new combustion-chamber manufacturing method.

Status: source-checked.

According to ESA, the Prometheus reusable rocket engine completed several hot-fire tests Oct. 29 at the P5 facility in Lampoldshausen, Germany, the European Space Agency said Friday. The bench was upgraded to supply methane fuel.

The tests included a combustion chamber made using cold gas spray, an additive process that bonds metal powder to a chamber body. ESA said the engine also demonstrated repeated ignition without a high-pressure starter system.

ESA said a later campaign will test an improved version called Mark 2, beginning at ArianeGroup’s Vernon center in France. The reported firings were ground tests, not a demonstration of reuse in flight.

What we know / what we don't

What we know

  • According to ESA, the Prometheus reusable rocket engine completed several hot-fire tests Oct. 29 at the P5 facility in Lampoldshausen, Germany, the European Space Agency said Friday. The bench was upgraded to supply methane fuel.
  • The tests included a combustion chamber made using cold gas spray, an additive process that bonds metal powder to a chamber body. ESA said the engine also demonstrated repeated ignition without a high-pressure starter system.
  • ESA said a later campaign will test an improved version called Mark 2, beginning at ArianeGroup’s Vernon center in France. The reported firings were ground tests, not a demonstration of reuse in flight.

What we don't know

  • Performance and manufacturing-benefit statements come from ESA; the release gives no demonstrated per-flight cost.

The source record

Sources

  1. European Space Agency